The problems of Industrialised Building System (IBS) associated with construction such as decreasing quality and productivity, unskilled labour, occupational safety, and inferior working conditions have hampered on the implementation of IBS in Malaysia but opened the possibility of more revolutionary solutions within the industry. One of the prospective options is the implementation of automation and robotics in IBS. Integrating automation and robotics into the design, manufacturing and construction processes of IBS offers not the only improvement in accuracy, consistency and efficiency, but also opportunity to improve the construction industry regarding productivity, safety, quality and increase the implementation rate of IBS in Malaysia. All the data and information gathered directly from libraries, books, articles and other printed materials searched in the international and national journals, proceeding and bulletin. This paper aims to identify the potential criteria for measurement of automation and robotics in IBS.
Abanda, F. H., Tah, J. H. M., & Cheung, F. K. T. (2017). BIM in off-site manufacturing for buildings. Journal of Building Engineering, 14(March), 89–102.
Rashid, A. M. N., Abdullah, M. R., & Ismail, D. (2018a). Critical Success Factors CSFs to Automation and Robotics in Industrialized Building System IBS Critical Success Factors CSFs to Automation and Robotics in Industrialized Building System IBS. International Journal of Academic Research in Business & Social Science, 8(12), 2207–2221.
Rashid, A. M. N., Abdullah, M. R., & Ismail, D. (2018b). Key Elements Towards Automation and Robotics in Industrialised Building System (IBS). In Proceedings of the ASEAN Post Graduate Conference (APGC) 2018, University of Malaya, Kuala Lumpur (pp. 152–160).
Rashid, A. M. N., Abdullah, M. R., Ismail, D., & Mahyuddin, M. N. (2018). Towards Automation And Robotics In Industrialised Building System ( IBS ): A Literature Review. In 3rd International Conference On Rebuilding Place (ICRP 2018). Ipoh, Perak.
Abulfahem, M. F. (2012). Mass customization limitation and guidelines in prefabricated construction. In T. Bock, C. Georgoulas, & T. Linner (Eds.), Proceedings of the CIB*IAARC W119 CIC 2012 Workshop.
Afsari, K., Ph, D., Gupta, S., Afkhamiaghda, M., & Lu, Z. (2018). Applications of Collaborative Industrial Robots in Building Construction, (August).
Alazzaz, F., & Whyte, A. (2014). Uptake of Off-site Construction?: Benefit and Future Application. International Journal of Civil, Environmental, Structural, Construction and Architectural Engineering, 8(12), 1168–1172.
Arshad, M. I. (2012). Automated Horizontal Building Construction – A new Paradigm. Proceeding of the CIB W 119 CIC 2012 Workshop Advanced Construction and Building Technology For Society, (November), 6–16.
Azman, M. N. A., Ahamad, M. S. S., & Hussin, W. M. A. W. (2012). Comparative Study on Prefabrication Construction Process. International Surveying Research Journal (ISrJ), 45–58.
Bari, N. A. A., Abdullah, N. A., Yusuff, R., Ismail, N., & Jaapar, A. (2012). Environmental Awareness and Benefits of Industrialized Building Systems (IBS). Procedia - Social and Behavioral Sciences, 50(December 2012), 392–404.
Bock, T. (2015). The future of construction automation: Technological disruption and the upcoming ubiquity of robotics. Automation in Construction, 59, 113–121.
CIDB. (2016). Construction Industry Transformation Program 2016 - 2020.
Cobb, D. W. (2001). Integrating automation into construction to achieve performance enhancements. CIB World Building Congress, (April), 1–11.
Din, M. I., Bahri, N., Dzulkifly, M. A., Norman, M. R., Kamar, K. A. M., & Hamid, A. Z. (2012). The adoption of industrialised building system (IBS) construction in Malaysia: The history, policies, experiences and lesson learned. 2012 Proceedings of the 29th International Symposium of Automation and Robotics in Construction, ISARC 2012, 1, 8.
Eastman, C. M., & Sacks, R. (2008). Relative Productivity in the AEC Industries in the United States for On-Site and Off-Site Activities. Journal of Construction Engineering and Management, 134(7), 517–526.
Eren, H., Sirinterlikci, A., Karaman, A., & Imamoglu, O. (2011). Automation and Robotics in Processes. Instrument Engineers’ Handbook, 158–168. http://doi.org/10.1201/b11093-11
Goodier, C. I., & Gibb, A. G. F. (2007). Future opportunities for offsite in the UK. Construction Management and Economics, (June 2007), 585–595.
Hamid, Z. A., Kamar, K. A., Alshawi, M. (2011). INDUSTRIALISED BUILDING SYSTEM ( IBS ): STRATEGY, PEOPLE AND PROCESS.
Hamid, A. R. A., Noor Azmi, M. R. A., Aminudin, E., Jaya, R. P., Zakaria, R., Zawawi, A. M. M., … Saar, C. C. (2019). Causes of fatal construction accidents in Malaysia. IOP Conference Series: Earth and Environmental Science, 220, 012044.
Hashemi, A. (2017). Prefabrication in the UK housing construction industry. 5th International Conference on Zero Energy Mass Customised Housing - ZEMCH 2016, (February), 1–15.
Kap
In-Text Citation: (Rashid, Abdullah, Ismail, & Saberi, 2019)
To Cite this Article: Rashid, M. N. A., Abdullah, M. R., Ismail, D., & Saberi, M. H. (2019). Automation and Robotics in Industrialized Building System (IBS): The Potential Criteria for Measurement. International Journal of Academic Research in Business and Social Sciences, 9(7), 1020–1034.
Copyright: © 2019 The Author(s)
Published by Human Resource Management Academic Research Society (www.hrmars.com)
This article is published under the Creative Commons Attribution (CC BY 4.0) license. Anyone may reproduce, distribute, translate and create derivative works of this article (for both commercial and non-commercial purposes), subject to full attribution to the original publication and authors. The full terms of this license may be seen at: http://creativecommons.org/licences/by/4.0/legalcode