International Journal of Academic Research in Business and Social Sciences

search-icon

Critical Success Factors CSFs to Automation and Robotics in Industrialized Building System IBS

Open access
The construction industry demands active construction organisations, efficient construction processes and innovative construction techniques to effectively compete under increasing globalisation, market competition and technological advancements in the twenty-first century. The problems of industrialised building system (IBS) associated with construction such as decreasing quality and productivity, unskilled labour, occupational safety, and inferior working conditions have opened the possibility of more revolutionary solutions within the industry. One of the prospective options is in the implementation of innovative technologies in construction such as automation and robotics, which has the potential to improve the industry regarding productivity, safety and quality. The Objective of this paper is to identify the critical success factors to automation and robotics in the Industrialised Building System to overcome the problems highlighted which can benefit the Malaysian Construction Industry as a whole.
Abd Hamid, Z., Chee Hung, F., & Abdul Rahim, A. H. (2017). Retrospective View and Future Initiatives in Industrialised Building Systems (IBS) and Modernisation, Mechanisation and Industrialisation (MMI). Modernisation, Mechanisation and Industrialisation of Concrete Structures, 424–452.
Abd Rashid, M. N., Abdullah, M. R., Ismail, D., & Mahyuddin, M. N. (2018). Towards Automation And Robotics In Industrialised Building System ( IBS ): A Literature Review. In 3rd International Conference On Rebuilding Place (ICRP 2018). Ipoh, Perak.
Alinaitwe, H. M., Mwakali, J., & Hansson, B. (2006). Assessing the degree of industrialisation in construction–a case of Uganda. Journal of Civil Engineering and Management, 12(3), 221–229.
Amberg, M., Fischl, F., & Wiener, M. (2005). Background of critical success factor research. Working Paper No 2/2005 (Vol. 17).
Andersson, N., & Lessing, J. (2017). The Interface between Industrialized and Project Based Construction. Procedia Engineering, 196(June), 220–227.
Anuar, K., Kamar, M., Hamid, Z. A., Zura, M., Zain, M., Hazim, A., … Azman, M. N. (2012). Drivers and Barriers of Industrialised Building System (Ibs) Roadmaps in Malaysia. Malaysian Construction Research Journal, 9(1), 1985–3807.
Anuar Mohamad Kamar, K., Alshawi, M., & Abd Hamid, Z. (2009). INDUSTRIALISED BUILDING SYSTEM?: THE CRITICAL SUCCESS FACTORS Research Methodology Relation of this Paper to Overall PhD Research Study. International Postgraduate Research Conference, 29–30.
Bock, T.T, Linner, T. (2010). Mass Customization in a Knowledge-based Construction Industry for Sustainable High- performance Building Production, 108–121.
Bock, T. (2006). Construction robotics. Journal of Robotics and Mechatronics, 28(2), 116–122.
Bock, T., Georgoulas, C., & Linner, T. (2014). Advanced Construction and Building Technology for Society.
Buckett, N. R. (2013). Building Better for Less - Advanced Residential Construction Techniques, 294.
CIDB. (2015). Construction Industry Tranformation Program 2016 - 2020. CIDB. (2018). Taking Malaysian Construction To New Levels. HEIGHTS, 3.
Cooke-Davies, T. (2002). The “real” success factors on projects. International Journal of Project Management, 20(3), 185–190.
?uš-Babi?, N., Rebolj, D., Nekrep-Perc, M., & Podbreznik, P. (2014). Supply-chain transparency within industrialized construction projects. Computers in Industry, 65(2), 345–353.
Dallasega, P., Rauch, E., & Linder, C. (2018). Industry 4.0 as an enabler of proximity for construction supply chains: A systematic literature review. Computers in Industry, 99(August 2017), 205–225.
Din, M. I., Bahri, N., Dzulkifly, M. A., Norman, M. R., Kamar, K. A. M., & Abd Hamid, Z. (2012). The adoption of industrialised building system (IBS) construction in Malaysia: The history, policies, experiences and lesson learned. 2012 Proceedings of the 29th International Symposium of Automation and Robotics in Construction, ISARC 2012, 1, 8.
Fritz, W. (2006). sucess factors of internet based Business Models. Technical Report.
Hassim, S., & Jaafar, M. S. (2009). The Contractor Perception Towers Industrialised Building System Risk in Construction Projects in Malaysia. American Journal of Applied Sciences, 6(5), 937–942.
Idoro, G. I. (2012). Sustainability of Mechanisation in the Nigerian Construction Industry. Journal of Civil Engineering and Management, 18(1), 91–105.
Ismail, F., Yusuwan, N. M., & Baharuddin, H. E. A. (2012). Management Factors for Successful IBS Projects Implementation. Procedia - Social and Behavioral Sciences, 68, 99–107.
Jabar, I. L., Ismail, F., & Mustafa, A. A. (2013). Issues in Managing Construction Phase of IBS Projects. Procedia - Social and Behavioral Sciences, 101, 81–89.
Kamar, K. A. M., Azman, M. N. A., & Nawi, M. N. M. (2014). IBS survey 2010: Drivers, barriers and critical success factors in adopting industrialised building system (IBS) construction by G7 contractors in Malaysia. Journal of Engineering Science and Technol
In-Text Citation: (Rashid, Abdullah, & Ismail, 2018)
To Cite this Article: Rashid, M. N. A., Abdullah, M. R., & Ismail, D. (2018). Critical Success Factors CSFs to Automation and Robotics in Industrialized Building System IBS. International Journal of Academic Research in Business and Social Sciences, 8(12), 2207–2221.