Procurement system provides an avenue for bringing together various service providers in a construction project, and for identifying and fulfilling the priority needs of the client for procuring the building or facility. Thus, it is critical that by making the right choice of a procurement system at the onset would indirectly ensure successful project delivery with satisfaction by all parties involved. There have been many attempts made to develop various model to assist in the decision making and selection of appropriate procurement system and most of the models are developed based on clients’ objectives and preferences and influenced by the project constraints. However, none of the previously established models give detail consideration on the cost aspects especially the hidden cost apart from the production cost. Therefore, the Transaction Cost Theory is appropriate to be applied in every phase of construction project and most importantly the application of this theory can become the basis of the clients in selecting the most ideal procurement system to be adopted for their construction projects. Unfortunately, Transaction Cost Theory is unknown and the awareness on application of Transaction Cost Theory in construction project among the industry players is very minimal. In fact, in Malaysian context, so far there is limited study done to relate the Transaction Cost Theory to any aspect of construction fields. The purpose of this research is to identify the common transaction cost incurred in different types of procurement system i.e. Traditional and Design and Build; to develop a framework in selecting the ideal procurement system based on the Transaction Cost Theory approach. Investigations would be limited to the views expressed by professional consultants in Malaysia. Structured questionnaires and expert interview will be conducted as data collection methods. Content analysis, multi-attribute analysis and rank correlation test will be used in the analysis of the data.
Adnan, H., Bachik, F., Supardi, A., & Marhani, M. A. (2012). Success Factors of Design and Build Projects in Public Universities. Procedia - Social and Behavioral Sciences, 35(December 2011), 170–179. https://doi.org/10.1016/j.sbspro.2012.02.076
Adnan, H., Jusoff, K., & Salim, M. K. (2008). The Malaysian Construction Industry ’ s Risk Management in Design and Build. Modern Applied Science, 2(5), 27–33.
Cantarelli, C. C., Wee, V. B., Molin, E. J. E., & Flyvbjerg, B. (2012). Different cost performance: different determinants? Transport Policy, 22, 88–95.
https://doi.org/10.1016/j.tranpol.2012.04.002
Chang, C.-Y., & Ive, G. (2011). Selecting Procurement System for Capital Projects: A Transaction Costs Perspectives. Advances in Business and Management, 2(January).
Chen, Y. Q., Liu, J. Y., Li, B., & Lin, B. (2011). Project delivery system selection of construction projects in China. Expert Systems with Applications, 38(5), 5456–5462. https://doi.org/10.1016/j.eswa.2010.10.008
Doan, P., & Menyah, K. (2013). Impact of Irreversibility and Uncertainty on the Timing of Infrastructure Projects. Journal of Construction Engineering and Management, 139(MARCH), 331–338. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000615.
Li, H., Arditi, D., Asce, M., & Wang, Z. (2013). Factors That Affect Transaction Costs in Construction Projects. Journal of Construction Engineering and Management, 139(JANUARY), 60–68. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000573.
Li, H., Arditi, D., & Wang, Z. (2014). Transaction costs incurred by construction owners. Engineering, Construction and Architectural Management, 21(4), 444–458. https://doi.org/10.1108/ECAM-07-2013-0064
Lo, T. Y., Fung, I. W. H., & Tung, K. C. F. (2006). Construction Delays in Hong Kong Civil Engineering Projects. Journal of Construction Engineering and Management, 132(June), 636–649.
Noor, M. A., Khalfan, M. M. A., & Maqsood, T. (2013). The role of procurement practices in effective implementation of infrastructure projects in Pakistan. International Journal of Managing Projects in Business, 6(4), 802–826. https://doi.org/10.1108/IJMPB-03-2012-0005
Odeck, J. (2004). Cost overruns in road construction—what are their sizes and determinants? Transport Policy, 11(1), 43–53. https://doi.org/10.1016/S0967-070X(03)00017-9
Oyegoke, A. S., Dickinson, M., Khalfan, M. M. A., McDermott, P., & Rowlinson, S. (2009). Construction project procurement routes: an in?depth critique. International Journal of Managing Projects in Business, 2(3), 338–354.
https://doi.org/10.1108/17538370910971018
Rajeh, M. (2014). Impacts of Procurement Systems on Transaction Costs: A Structural Equation Modelling Methodology. Proceedings of the 4th New Zealand Built Environment Research Symposium (NZBERS), (2014), 1–34.
Rajeh, M. A., Tookey, J. E., Olabode, J., & Rotimi, B. (2016). Developing a procurement path determination chart SEM-based approach Developing a procurement path determination chart SEM-based approach. Journal of Construction Management and Economics, (March). https://doi.org/10.1080/01446193.2016.1151538
Rajeh, M. A., Tookey, J., & Rotimi, J. (2011). Procurement Selection Model?: Development of a Conceptual Model Based on Transaction Costs. Australasian Journal of Construction Economics and Building Conference Series, 2(1990), 56–63.
Rajeh, M., Tookey, J. E., & Rotimi, J. O. B. (2015). Estimating transaction costs in the New Zealand construction procurement. Engineering, Construction and Architectural Management, 22(2), 242–267. https://doi.org/10.1108/ECAM-10-2014-0130
Stanford, M. S., & Molenaar, K. R. (2016). Measuring Owner Transaction Costs in Construction Contracting. Construction Research Congress, 398–407.
Whittington, J., & Dowal, D. E. (2006). Transaction-cost economic analysis of institutional change toward design-build contracts for public transportation. eScholarship University of California, (April). Retrieved from http://escholarship.org/uc/item/qv
Xioa-Hua, J. (2009). Allo
In-Text Citation: (Ismail, Isa, & Yusop, 2018)
To Cite this Article: Ismail, W. N. W., Isa, S. S. M., & Yusop, N. (2018). Ideal Construction Procurement System based on Transaction Cost Approach. International Journal of Academic Research in Business and Social Sciences, 8(1), 807–814.
Copyright: © 2018 The Author(s)
Published by Human Resource Management Academic Research Society (www.hrmars.com)
This article is published under the Creative Commons Attribution (CC BY 4.0) license. Anyone may reproduce, distribute, translate and create derivative works of this article (for both commercial and non-commercial purposes), subject to full attribution to the original publication and authors. The full terms of this license may be seen at: http://creativecommons.org/licences/by/4.0/legalcode