Due to the fabless characteristic of the IC design industry, all the production and manufacturing procedures of the entire product have been outsourced to outsourcing foundries/fabs, therefore subcontractor’s performance will also affect the competitiveness of IC design companies. Managers need a simple and reliable method of supplier performance ratings for production decisions reference. The purpose of this study is to apply the Theory of Constraints (TOC) which proposed sub-system performance indicators throughput dollar-day (TDD) for using in subcontractor performance indicators rating and study the feasibility of using TDD as a performance indicators for IC design industry outsource management. The TDD is easier than the current measure of outsourcing can be clearly demonstrated both advantage and disadvantage of outsourcing factory. Finally, this study provides a convenience and reliability of performance measurement indicators, so that manager can do good work for subcontractor’s performance measurement and support manager to do outsourcing decisions, and strengthen company competitive advantage.
Anrold, U., (2000), “New dimensions of outsourcing: a combination of transaction cost economics and the core competencies concept,” European Journal of Purchasing & Supply Management, Vol. 6, No. 1, pp.23-29.
Chen, C.C., (2004), “A Study of supplier performance rating using total-involved-quality-costs analysis,” Journal of the Chinese Institute of Industrial Engineers, Vol. 21, No. 3, pp. 272-281.
Cheng, C.S. and Chen, K.I., (2008), “The Study of Outsourcing Evaluation Indictors for Electronic Manufacturing Industry,” Journal of Quality, Vol. 15, No. 1, pp.23-37.
Dickson, G.W., (1996), “An analysis of vendor selection systems and decisions,” Journal of Purchasing, Vol. 2, No. 1, pp. 5-17.
Huang, Y.H., (2007), “Research on using TDD as the subcontractor performance index-A case of memory manufacturing company,” Master thesis, Department of Industrial Engineering and Management, National Chiao-Tung University, Hsin-Chu, Taiwan.
Huang, C.Y., C.P. Chen, R.K. Li and C.H. Tsai, (2008), "Applying Theory of Constraint on Logistic Management in Large Scale Construction Sites~ A Case Study of Steel Bar in TFT-LCD Factory Build-Up," The Asian Journal On Quality, Vol. 9, No. 1, pp.68-93.
Huang, C.L., H.G. Chang, R.K. Li and C.H. Tsai, (2011), “Using game and statistical analysis to confirm Goldratt’s logical analysis of poor delivery in a multi-project environment,” South African Journal of Industrial Engineering, Vol. 22, No. 2, pp.133-150.
IEK, (2012), “2012 Taiwan IC Industry Yearbook,” Industrial Economics & Knowledge Center, Taiwan.
Kotabe, M., (1990), “The Relationship between Offshore Sourcing and Innovativeness of U.S. Multinational Firms: An Empirical Investigation,” Journal of International Business Studies, Vol. 21, No. 4, pp. 623-638.
Labbs, J.J., (1993), “Successful outsourcing depends on critical factors,” Personnel Journal, Vol. 72, pp.51-60
Lei, D., and M. Hitt, (1995), “Strategic Restructuring and Outsourcing: The Effect of Merger and Acquisitions and LBOs on Building Firm Skills and Capabilities,” Journal of Management, Vol. 21, No. 5, pp. 835-859.
Liu, F.H., and Hai, H.L. (2005), “The voting analytic hierarchy process method for selecting supplier,” International Journal of Production Economics, Vol. 97, No. 3, pp.308-317.
Loh, L., and Venkatraman, N., (1992), “Determinants of Information Technology Outsourcing: A Cross-sectional Analysis,” Journal of Management Information Systems, Vol. 9, No. 1, pp. 7-24.
Minoli, D., (1995), “Analyzing outsourcing: reengineering information and communication systems,” McGraw-Hill, Inc. New York, NY, USA.
Pi, W.N., (2005), “Supplier Evaluation Using AHP and TOPSIS,” Journal of Science and Engineering Technology, Vol. 1, No. 1, pp.75-83.
Sharpe, M., (1997), “Outsourcing, organizational competitiveness and work,” Journal of Labor Research, Vol. 18, No. 4, pp.535-549.
Swift, C.O. (1995), “Preferences for single sourcing and supplier selection criteria,” Journal of Business Research, Vol. 32, No. 2, pp.105-111.
Torng, C.C., C.C. Tseng, P.H. Lee, and S.C. Chang, (2009), “Constructing Supplier Performance Evaluation Model on IC Design Industry in Taiwan and Empirical Study,” Journal of Technology Management, Vol. 14, No. 2, pp.1-26.
Tsai, F.L. and Wang, F.S., (2005), “Reflection and Prospection for the Changing of Work under Strategic Global Outsourcing,” Asia-Pacific Economic and Management Review, Vol. 8, No. 2, pp.61-76.
Copyright: © 2013 The Author(s)
Published by Knowledge Words Publications (www.kwpublications.com)
This article is published under the Creative Commons Attribution (CC BY 4.0) license. Anyone may reproduce, distribute, translate and create derivative works of this article (for both commercial and non-commercial purposes), subject to full attribution to the original publication and authors. The full terms of this license may be seen at: http://creativecommons.org/licences/by/4.0/legalcode