Monitoring, Evaluation and Control are very important management functions for ensuring that project objectives are fully achieved and that the project remains on course. The Constituency Development Fund was created in 2003 in Kenya out of the desire to achieve community driven development where the local communities generate their own development agenda and get it funded by the central government. Therefore, this study investigates how monitoring and evaluation affects the success of Constituency Development Fund Projects in Kenya - Gatanga Constituency being a case study. The aim of this study is to establish whether the project monitoring and control efforts of the contractors and project supervisors contribute to an improved project outcome. A field survey was conducted using a sample of 45 respondents who were selected by stratified random sampling. The data were collected using structured questionnaires and analyzed using Statistical Package for Social Sciences (SPSS, Version 16.0). The results of the study reveal that contractors and project supervisors apply monitoring tools to a certain level in their project operations consequently producing satisfactory levels of success. The findings further reveal that most constituency development fund projects in Gatanga Constituency were completed within the stipulated time frame and budget and that majority of the respondents considered them a success.
Anthony, R. (1965). Planning and Control System: A Framework for Analysis. Massachusetts: Division of Research, Graduate School of Business Administration, Harvard University.

Arditi, J. (1985). Construction Productivity Improvement. Journal of the Construction Division (ASCE), 111(1): 1–4.
Atkinson, R. (1999). Project Management: cost, time and quality, two best guesses and a phenomenon, it’s time to accept other success criteria. International Journal of Project Management, Vol. 17 No. 6, pp. 337-42.

Centre for Governance and Development, (2007). National Devolve Funds Report, Institutional Procedures and Structures. Centre for Governance and Development Publishing. Nairobi: Kenya.

Chitere, P., & Ireri, N. (2004). District Focus for Rural Development in Kenya: It’s Limitations as a Decentralization and Participatory Planning Strategy and Prospects for the Future. Nairobi: Institute for Policy Analysis and Research.

Claudia,L., Oleg, P. (2011). Project Managers' Perception of Project Success Factors – A Repertory Grid Investigation. University of Cologne.
Constituencies Development Fund Board, (2011). 2010 – 2014 Strategic Plan, Equitable Development for Kenyans. Government Press. Nairobi, Kenya.

Enshassi, A. (1996). A Managing and Controlling System in Managing Infrastructure Projects. Building Research and Information Journal, 24(3): 163–189.

Faniran, O., Oluwoye, J. & Lenard, D. (1998). Interactions between Construction Planning and Influence Factors. Journal of Construction Engineering and Management, 124(4) (July/August): 245–258.

Gobeli, D. & Larson, W. (1987). Relative Effectiveness of Different Project Structures. Project Management Journal, Vol 18, No. 2 pp 81-85.

G.O.K, (2005. Millennium Development Status Report for Kenya. Government Press .Nairobi, Kenya.

G.O.K, (2009). Constituency Development Fund Status Report. Government Press. Nairobi, Kenya.

G.O.K, (2003). Constituencies Development Fund Act 2003.
http://www.cdf.go.ke/images/docs/revised%20cdf%20act%2_annotatedversion.pd Retrieved 11th April 2013.

G.O.K, (2010). Constituencies Development Fund Board 2010 – 2014 Strategic Plan, Equitable Development for Kenyans. Government Press. Nairobi, Kenya.

G.O.K, (2007). National Devolved Funds Report. Government Press. Nairobi, Kenya.

G.O.K, (2003). Interim Poverty Reduction Strategy Paper 2000/03. Government Press. Nairobi, Kenya.

Hatush, Z. & Skitmore, M. (1997). Evaluating Contractor Prequalification Data: Selection criteria and project success factors. Journal of Construction Management and Economics, 15(2): 129–147.

Ibeto, I. & Chinyeaka , J. (2012). Issues and Challenges in Local Government Project Monitoring and Evaluation in Nigeria: The Way Forward. European Scientific Journal August edition vol. 8, No.18 ISSN: 1857 – 7881 (Print) e - ISSN 1857- 7431.

Idoro, G. (2012). Influence of the Monitoring and Control Strategies of Indigenous and Expatriate Nigerian Contractors on Project Outcome. Journal of Construction in Developing Countries, 17(1) 2012, 49–67. Penerbit Universiti Sains Malaysia.

Idoro G. (2008). Effect of Mechanisation on Project Performance in the Nigerian Construction Industry. Proceedings: RICS Construction and Building Research Conference (COBRA 2008). Dublin Institute of Technology, Dublin, UK, 4–5 September 2008.

Kibua, N., Mapesa, B. (2006). An Assessment of the Management and Utility of the Constituency Development Fund in Kenya. Nairobi: Institute of Policy Analysis and Research.

Kimani, F., Nekesa, P., & Ndung’u, B. (2009). Best Practices in Constituency Development Fund.
Collaborative Centre for Gender Development.

Kimweli, J. (2013). The Role of Monitoring and Evaluation Practices to the Success of Donor Funded Food Security Intervention Projects: A Case Study of Kibwezi District, Kenya. International Journal of Academic Research in Business and Social Sciences June 2013, Vol. 3, No. 6 ISSN: 2222-6990.

Kothari, C. (2004). Research Methodology: Methods and Techniques (2nd Edition). New Age International Publishers. New Delhi.
Kursave, J. (2003). The Necessity of Project Schedule Updating, Monitoring status. Journal of Cost Engineering, 45(7): 8–14.

Ling, F. & Chan, S. (2002). Performance Evaluation of alternative Project Procurement Methods. Research brief. National University of Singapore.

Ling, F., Chan, S., Chong, E. & El, P. (2004). Predicting Performance of Design-build and Design-bid-build Projects. Journal of Construction Engineering and Management (ASCE), 130(1) (Jan/Feb): 10–20.

Lawal, T. & Onohaebi, S. (2010). Project Management: A panacea for incidence of failed projects in Nigeria. International Journal of Research. Volume2, No.5.

Mauricio, M. & Carlos, T. (2002). Contribution to the Evaluation of Production Planning and Control System in Building Companies. Proceedings: IGL Conference. Granado, Brazil.

Michell, K., Bowen, P., Cattell, K., Edward, P. & Pearl, R. (2007). Stakeholder perceptions of contractor time, cost and quality management on building project. Proceedings: The CIB World Building Conference on Construction for Development. Cape Town, South Africa, 14–18 May. Rotterdam: International Council of Building Research (CIB), 231–240.

Mugenda, A. & Mugenda, O. (2003). Research Methods, Qualitative and Quantitative Approaches. Nairobi: Act Press.

Musomba, K., Kerongo, F., Mutua, N. & Kilika, S. (2013). Factors affecting the Effectiveness of Monitoring and Evaluation of Constituency Development Fund Projects in Changamwe Constituency, Kenya. Journal of International Academic Research for Multidiscipinary Vol 1, Issue 8.

Mwangi, K. (2005). Efficiency and Efficacy of Kenya’s Constituency Development Fund: Theory and Evidence. Economics Working Papers paper. 200542(www.digitalcommons.ucon.edu). Retrieved April 23, 2011.

Naoum, S. (1991). Procurement and Project Performance Occasional Paper 45. London: Chartered Institute of Building.

National Taxpayers Association, (2012). Constituency Development Fund Ranking. National Taxpayers Association. Nairobi, Kenya.

Odiorne, S. (1965). Management by Objectives. Pitman, 1st Edition. New York.



Ongoya,Z. & Lumallas, E. (2005). A critical Appraisal of the Constituency Development Fund Act. Institute of Public Policy Analysis. Nairobi.

Otieno, F. (2000). The Roles of Monitoring and Evaluation in Projects. Proceedings: 2nd CIB W107 Construction in Developing Countries International Conference on Challenges Facing the Construction Industry in Developing Countries. Gaborone, Botswana. 15–17 November.

Ritz, G. (1994). Total Construction Project Management. 1st Edition. New York: McGraw Hill Book Company.

PASSIA: (2004) Civil Society empowerment: Monitoring and Evaluation.
www.passia.org/seminars/2002/monitoring.htm (Accessed on 17/4/2012)

Pinto, J. & Kharbanda, P. (1996). Successful Project Managers: Leading your team to Success. New York: Van Nostrand Reinhold.
PMBOK Guide, (2004). A Guide to the Project Management Body of Knowledge. Project Management Institute Inc. 3rd edition.

Romero, R. (2009). Decentralisation, Accountability: The Case of the Constituency Development Fund in Kenya. Paper 02. University of Oxford. Vol. 2: London, University Press.

Shapiro, J. (2004). Monitoring and Evaluation. Johannesburg: CIVICUS

Shenhar, J. (1997). From Theory to Practice: Toward a Typology of Project Management Styles. IEEE Transactions on Engineering Management 45(1) : 33-48.

Subramanian, G., Klein, G., Jian, J. & Chien-Lung, C. (2009). Balancing four Factors in System Development Projects. Communications of the ACM, 52 (10), 118-121.

Thomas, R., Macken, C., Chung, T. & Kim, I. (2002). Measuring the Impact of the Delivery System on Project Performance: Design-Build and Design-Bid-Build. NIST GCR 02-840. Austin: Construction Industry Institute.

Uitto, J. (2004). Multi-Country Co-operation around Shared Waters: Role of Monitoring and
Evaluation. Global Environmental Change, 14(1): 5 – 14.

UNDP, (2006). Handbook on Monitoring and Evaluation for Results. UN: Millennium Development Goals Repobnvgrt 2006.
Mwangu, A. W., & Iravo, M. A. (2015). How Monitoring and Evaluation Affects the Outcome of Constituency Development Fund Projects in Kenya: A Case Study of Projects in Gatanga Constituency. International Journal of Academic Research in Business and Social Sciences, 5(3). 12-28.