Every industry in a country is attempting to adopt all of the sophisticated technology that is available in conjunction with the advancement of technology. Abruptly, the establishment of the Construction Industry Master Plan (CIMP) has resulted in initiatives in the implementation of innovative approaches towards a sustainable construction environment via the Industrialised Building System (IBS). However, since the first IBS project in 1964 until today, IBS in Malaysia has been poorly accepted by construction parties due to a failure to adequately manage risks in IBS projects. Therefore, this study aims to focus the contractor’s perspectives on the constraints of IBS implementation in order to assist contractors in their decision-making towards achieving effective project delivery. This study employed a quantitative approach. 85 questionnaires were distributed to local contractors (G1 to G7) that specialised in IBS project and 45 respondents the questionnaires. The results were analysed using the SPSS version 28 and descriptive statistical analysis. According to the results of the analysis, respondents agreed that the main five (5) constraints in implementation of IBS project were high initial cost, required high skilled labour, fluctuation of raw material price, lack of technology implementation and lack of financing.
Abd Rahman, A. B., & Omar, W. (2006). Issues and challenges in the implementation of industrialised building systems in Malaysia. Proceedings of the 6th Asia-Pacific Structural Engineering and Construction Conference, September, C-45-C–53. http://eprints.utm.my/529/
Alawag, A. M. M., Alaloul, W. S., Liew, M. S., Al-Bared, M. A. M., Zawawi, N. A. W. A., & Ammad, S. (2021). The Implementation of the Industrialized Building System in the Malaysian Construction Industry—a Comprehensive Review. Lecture Notes in Mechanical Engineering, 3–16. https://doi.org/10.1007/978-981-16-0742-4_1
Arashpour, M., Wakefield, R., Blismas, N., & Minas, J. (2015). Optimization of process integration and multi-skilled resource utilization in off-site construction. Automation in Construction, 50(C), 72–80. https://doi.org/10.1016/J.AUTCON.2014.12.002
Ashraf, M., Fateh, M., Mohammad, M. F., Saifuza, A., & Shukor, A. (2017). Review in formulating the standard form of contract for Industrialized Building System (IBS) construction approach in Malaysia.
Dzulkalnine, N., Azman, M. N. A., Bing, K. W., & Hamid, Z. A. (2017). Payment issue of industrialised building system (IBS) in Malaysian construction industry. Malaysian Construction Research Journal, 2(Special Issue 2), 36–47.
Dzulkalnine, N., Nor, M., Azman, A., & Wai, K. (2016). Jurnal Teknologi ISSUES OF PAYMENT PROCUREMENT PROCESS FOR INDUSTRIALISED BUILDING. 10, 11– 15.
Hwang, B. G., Shan, M., & Looi, K. Y. (2018). Key constraints and mitigation strategies for prefabricated prefinished volumetric construction. Journal of Cleaner Production, 183, 183–193. https://doi.org/10.1016/J.JCLEPRO.2018.02.136
Jabar, I. laili, Ismail, F., & Mustafa, A. A. (2013). Issues in Managing Construction Phase of IBS Projects. Procedia - Social and Behavioral Sciences, 101, 81–89. https://doi.org/10.1016/j.sbspro.2013.07.181
Jaffar, Y., & Lee, C. K. (2020). JOURNAL OF GOVERNANCE AND INTEGRITY (JGI) Factors Influencing Industrialized Building System (IBS) Project Performance: A Systematic Review. https://doi.org/10.15282/jgi.3.2.2020.5311
Kasim, N., Al-Sham, M. H., Latiff, A. A., Ibrahim, M. U., Zainal, R., & Mohd Noh, H. (2019). Improving Contractors’Practices of Industrialized BuildingSystem (IBS) Implementation in Construction Industry. Journal of Technology Management and Business, 6(3), 40–49. https://doi.org/10.30880/jtmb.2019.06.03.005
Lu, N. (2007). Perceptions of Offsite Construction Techniques (Issue May).
Kamar, M. K. A., Alshawi, M., & Abd Hamid, Z. (2009). Barriers To Industrialized Building System (Ibs): the Case of Malaysia. Built and Human Environment 9th International Postgraduate Research Confrence, 2009, 1–16.
Nawi, M., Lee, A., & Nor, M. K. (2011). Barriers to implementation of the Industrialised Building System (IBS) in Malaysia. The Built & Human Environment Review, 4(February 2015), 22–35.
Mydin, M. A. O., Sani, N. M., & Taib, M. (2014). Industrialised Building System in Malaysia: A Review. MATEC Web of Conferences. https://doi.org/10.1051/C
Nasir, N. M., Nasrun, M., Nawi, M., Kamarul, M., Rahim, I. A., Bahaudin, A. Y., & Tapa, A. (2016). A REVIEW OF DELAY FACTORS IN MALAYSIAN INDUSTRALISED BUILDING SYSTEM (IBS) CONSTRUCTION PROJECT. ARPN Journal of Engineering and Applied Sciences, 11(16). www.arpnjournals.com
Nasrun, M., Nawi, M., Azree, M., Mydin, O., Nursal, A. T., Akmar, F., Nifa, A., & Bahaudin, A. Y. (2015a). AENSI Journals Advances in Environmental Biology Payment issues in Malaysia Industrialised Building System (IBS): Literature visit. Advances in Environmental Biology, 9(4), 185–188. http://www.aensiweb.com/AEB/
Nasrun, M., Nawi, M., Azree, M., Mydin, O., Nursal, A. T., Akmar, F., Nifa, A., & Bahaudin,
A. Y. (2015b). AENSI Journals Advances in Environmental Biology Payment issues in Malaysia Industrialised Building System (IBS): Literature visit. Advances in Environmental Biology, 9(4), 185–188. http://www.aensiweb.com/AEB/
Rashidi, A., & Ibrahim, R. (2017). The Open Construction and Building Technology Journal Industrialized Construction Chronology: The Disputes and Success Factors for a Resilient Construction Industry in Malaysia. The Open Construction and Building Technology Journal, 11, 286–300. https://doi.org/10.2174/1874836801711010286
Saggaff, A. (2017). Industrialized building system-an innovative construction method.
MATEC Web of Conferences.
Warszawski, A. (1999). Industrialization and Automated Buildings Systems: A managerial Approach.
Wong, T. A. (2020). Covid-19 Exclusives: A Good Time to Adopt the Industrialised Building System. Penang Monthly.
https://penangmonthly.uat.emanon.com.my/article/17450/covid-19-exclusives-a-good- time-to-adopt-the-industrialised-building-system-1.
In-Text Citation: (Saberi et al., 2022)
To Cite this Article: Saberi, M. H., Zulkifli, N. D., Bakar, N. A., Zainuddin, M. F., & Saidin, M. T. (2022). Constraints in Implementation of Industrialised Building System (IBS) Project: Contractors’ Perspective. International Journal of Academic Research in Business and Social Sciences, 12(8), 1719– 1726.
Copyright: © 2022 The Author(s)
Published by Knowledge Words Publications (www.kwpublications.com)
This article is published under the Creative Commons Attribution (CC BY 4.0) license. Anyone may reproduce, distribute, translate and create derivative works of this article (for both commercial and non-commercial purposes), subject to full attribution to the original publication and authors. The full terms of this license may be seen at: http://creativecommons.org/licences/by/4.0/legalcode