International Journal of Academic Research in Business and Social Sciences

search-icon

Hindrance in Safety Management Practices in The Construction of Infrastructure Projects

Open access

Norakmarwati Ishak, Muhammad Irfan Bin Mansor, Asmalia Che Ahmad, Adnin Syaza Jaafar, Noraidawati Jaffar

Pages 765-772 Received: 17 Jun, 2022 Revised: 18 Jul, 2022 Published Online: 09 Aug, 2022

http://dx.doi.org/10.46886/IJARBSS/v12-i8/12327
Safety management is one of the safety frameworks that can be applied in construction industry to mitigate the occurrence of accidents and reducing the fatality rate among construction workers. However, data in 2020 shows that there were 206 cases of reported accidents in the construction industry in Malaysia, from January to December 2020. The increasing number of accidents in infrastructure projects involving construction workers has been around for a long time even though the safety management system had been implemented. Thus, the objective of this research is to determine the hindrance factors in safety management practices in the construction of infrastructure projects. A total of 205 questionnaire surveys were distributed to the safety officers who work at G7 contractor specialise in infrastructure projects in Kuala Lumpur area using a snow-balling data collection method. The result revealed that the tight project schedule, poor participation in the safety management practices and poor safety culture are the significant factors that hinders the safety management practices. While lack of motivation among workers is the least important factor that hinder the safety management practices. Thus it is hoped that by tackling and solving these issues may improve the safety management practices, and indirectly reducing the number of accidents and fatalities on the construction site.
Aburumman, M., Newnam, S., & Fildes, B. (2019). Evaluating the effectiveness of workplace interventions in improving safety culture: A systematic review, Safety Science, Vol. 115, 376-392,
Al-Bayati, A. J., Albert, A., & Ford, G. (2019). Construction safety culture and climate: Satisfying necessity for an industry framework. Practice Periodical on Structural Design and Construction, 24(4), 04019028.
Ayob, A., Shaari, A. A., Zaki, M. F. M., & Munaaim, M. A. C. (2018). Fatal occupational injuries in the Malaysian construction sector–causes and accidental agents. In IOP Conference Series: Earth and Environmental Science (Vol. 140, No. 1, p. 012095). IOP Publishing.
Bayram, M., Arpat, B., & Ozkan, Y. (2021). Safety priority, safety rules, safety participation and safety behaviour: The mediating role of safety training. International journal of occupational safety and ergonomics, 1-11.
Cui, C., Liu, Y., Hope, A., & Wang, J. (2018). Review of studies on the public–private partnerships (PPP) for infrastructure projects. International Journal of Project Management, 36(5), 773-794.
Department of Occupational Safety and Health. (2014). Two Firms Fined Over Second Penang Bridge Collapse – The Star Online. Department of Occupational Safety and Health (DOSH).
El-Sayegh, S. (2018), "Resource levelling optimization model considering float loss impact", Engineering, Construction and Architectural Management, Vol. 25 No. 5, 639-653.
Eltayf, O. K. A. (2020). Evaluation Of The Factors Influencing Safety Performance On Infrastructure Projects In Gaza Strip (Doctoral Dissertation, Anadolu University).
Ghasemi, F., Mohammadfam, I., Soltanian, A. R., Mahmoudi, S., & Zarei, E. (2015).Surprising Incentive: An Instrument for Promoting Safety Performance of Construction Employees, Safety and Health at Work, 6(3), 227-232,
Hasan, A., Baroudi, B., Elmualim, A., & Rameezdeen, R. (2018). Factors affecting construction productivity: a 30 year systematic review. Engineering, Construction and Architectural Management, 25(7), 916-937.
Jaafar, M. H., Arifin, K., Aiyub, K., Razman, M. R., Ishak, M. I. S., & Samsurijan, M. S. (2018). Occupational safety and health management in the construction industry: a review. International Journal of Occupational Safety and Ergonomics, 24(4), 493-506.
Jazayeri, E., & Dadi, G. B. (2017). Construction safety management systems and methods of safety performance measurement: A review. Journal of Safety Engineering, 6(2), 15-28.
Krejcie, R. V., & Morgan, D. W. (1970). Determining Sample Size for Research Activities. Educational and psychological measurement, 30(3), 607-610.
Leonard, S., & O’Donovan, A (2018). Measuring safety culture: Application of the Hospital Survay on Patient Safety Culture to Radiation therapy departments worldwide. Practical Radiation Oncology, 8(1), 17-26
Li, Y., & Guldenmund, F. W. (2018). Safety management systems: A broad overview of the literature. Safety science, 103, 94-123.
Medway, R. L., & Fulton, J. (2012). When more gets you less: a meta-analysis of the effect of concurrent web options on mail survey response rates. Public opinion quarterly, 76(4), 733-746.
Mubarak, S. (2015). Construction project scheduling and control. Wiley. New Jersey.
Nulty, D. D. (2008). The adequacy of response rates to online and paper surveys: what can be done?. Assessment & evaluation in higher education, 33(3), 301-314.
Osabiya, B. J. (2015). The effect of employees’ motivation on organizational performance. Journal of public administration and policy research, 7(4), 62-75.
Othman, I., Shafiq, N., & Nuruddin, M. F. (2017). Effective safety management in construction project. In IOP conference series: materials science and engineering (Vol. 291, No. 1, p. 012018). IOP Publishing.
Shamsuddin, K. A., Ani, M. N. C., Ismail, A. K., & Ibrahim, M. R. (2015). Investigation the Safety, Health and Environment (SHE) protection in construction area. International Research Journal of Engineering and Technology, 2(6), 624-636.
Shohet, I. M., Luzi, M., & Tarshish, M. (2018). Optimal allocation of resources in construction safety: Analytical-empirical model. Safety Science, 104, 231-238.
Skeepers, N. C., & Mbohwa, C. (2015). A study on the leadership behaviour, safety leadership and safety performance in the construction industry in South Africa. Procedia Manufacturing, 4, 10-16.
Sunindijo, R. Y., & Zou, P. X. (2015). Strategic safety management in construction and engineering. John Wiley & Sons.
Yiu, N. S., Chan, D. W., Shan, M., & Sze, N. N. (2019). Implementation of safety management system in managing construction projects: Benefits and obstacles. Safety science, 117, 23-32.
Yiu, N. S., Sze, N. N., & Chan, D. W. (2018). Implementation of safety management systems in Hong Kong construction industry–A safety practitioner's perspective. Journal of safety research, 64, 1-9.
Zhou, Z., Goh, Y. M., & Li, Q. (2015). Overview and analysis of safety management studies in the construction industry. Safety science, 72, 337-350.
Zidane, Y. J., Klakegg, O. J., Andersen, B., & Hussein, B. (2018). “Superfast!” managing the urgent: case study of telecommunications infrastructure project in Algeria. International Journal of Managing Projects in Business.
In-Text Citation: (Ishak et al., 2022)
To Cite this Article: Ishak, N., Mansor, M. I. Bin, Ahmad, A. C., Jaafar, A. S., & Jaffar, N. (2022). Hindrance in Safety Management Practices in The Construction of Infrastructure Projects. International Journal of Academic Research in Business and Social Sciences, 12(8), 765– 772.