The occurrence of variation order can be divided into four categories which are client-related variation order, consultant-related variation orders, contractor-related variation order, and other-related variation order. Most of the occurrence of variation order are related to the design, specifications, drawings and scope of works originated from the consultant. Therefore, this research aims to determine the consultant’s role in minimizing the occurrence of the variation order. The questionnaires were distributed by hand or email to potential respondents around The Federal Territory of Kuala Lumpur and analysed using the descriptive analysis. In order to reduce the occurrence of variation orders, coordination between designers and owner in the design stage would help to spot the noncompliance to the owner’s demand. Hence, another action of the consultant is to prepare complete contract document before tendering stage. Therefore, in order to develop effective strategies to reduce variation and improve project productivity performance, the findings will help consultants to focus on the root causes of variation during pre-contract or post contract stage.
Acharya, N. K., Lee, Y. D., & Im, H. M. (2006). “Design Errors: Tragic for the Clients.” Construction Research 7(1): 177-190.
Arain, F. M., and Pheng, L. S., and Assaf, S. A. (2006). “Contractors' views of the potential causes of inconsistencies between design and construction in Saudi Arabia.” Performance of Constructed Facilities 20(1): 74-83.
Arain, F. M. & Pheng, L. S. (2005). “The Potential Effects of Variation Orders on Institutional Building Projects.” Facilities 23(11/12): 496-510.
Hanna, A. S. P. E., Calmic, R., Peterson, P. A., Nordheim, E. V. (2002). “Quantitative Definition of Projects Impacted by Change Orders.” Construction Engineering and Management 128 (1): 57-64.
Harbans, S. (2002). “Valuation of Varied Work: A Commentary.” Construction Engineering and Management 20(3): 32-42.
Mokhtar, A., Bedard, C., and Fazio, P. (2000). “Collaborative Planning and Scheduling of Interrelated Design Changes.” Architectural Engineering 6(2): 66-75.
Mohammad, N., Che Ani, A., Rakmat & Yusof, M. (2010). “Investigation on the causes of variation orders in the construction of building project - a study in the state of Selangor, Malaysia.” Building Performance 1(1): 73- 82.
Oladapo, A. A. (2007). “A Quantitative Assessment of the Cost and Time Impact of Variation Orders on Construction Projects.” Engineering, Design and Technology 5(1): 35-48.
Ssegawa, J. K., Mfolwe, K. M., Makuke, B., & Kutua, B. (2002). “Construction Variations: A Scourge or a Necessity.” Management in Engineering 12(1): 87-96.
Sunday, O. (2010). “Impact of Variation Orders on Public Construction Projects.” Construction Industry Development 4(3): 101-110
Thomas, H. R., and Napolitan, C. L. (1995). “Quantitative Effects of Construction Changes on Labor Productivity.” Construction Engineering and Management 121(3): 290-296.
Uyun, N. M. Y. (2007). “Report on the Variation Control Affecting Construction Works for Lembaga Kemajuan Tanah Persekutuan (FELDA).” Msc Thesis, University Technology Malaysia
Wang, Y. (2000). “Coordination issues in Chinese large building projects.” Management in Engineering 16(6): 54-61.
Yadeta, A. E. (2014). Report on The Impact of Variation Orders on Public Building Projects in Addis Ababa. Addis Ababa University School of Graduate Studies.
In-Text Citation: (Ismail et al., 2022)
To Cite this Article: Ismail, N., Aziz, T. N. H. T. A., Zain, N. M., Shuib, M. N., & Hasbullah, M. N. (2022). Consultant’s Role in Minimizing The Occurance of Variation Order. International Journal of Academic Research in Business and Social Sciences, 12(11), 2345– 2352.
Copyright: © 2022 The Author(s)
Published by Knowledge Words Publications (www.kwpublications.com)
This article is published under the Creative Commons Attribution (CC BY 4.0) license. Anyone may reproduce, distribute, translate and create derivative works of this article (for both commercial and non-commercial purposes), subject to full attribution to the original publication and authors. The full terms of this license may be seen at: http://creativecommons.org/licences/by/4.0/legalcode